Whole-Home Rewiring for
Glendale Homeowners.
Older homes hide aging wiring — knob-and-tube, aluminum branch, cloth-jacketed Romex. A full rewire resolves every electrical issue at once.
We work in Glendale regularly — on 1940s-1970s homes — Glendale has its own utility (GWP). Every whole-home rewiring job is permitted through the right authority (City of Glendale / GWP), built to NEC 2023, backed by a written workmanship warranty, and finished cleanly. The Alpha One Electric standard doesn’t change by city — only the local permit details do.
What’s Included.
- Full removal of old wiring (K&T, aluminum, cloth Romex)
- New copper Romex throughout, sized to NEC 2023
- New panel and breakers (typically 200A Siemens)
- All new outlets and switches in Leviton Decora
- All new junction boxes properly sized
- Full AFCI/GFCI protection per NEC 2023
- Smoke/CO detector circuits hardwired and interconnected
- Dedicated circuits for major appliances
- Grounding system upgrade
- Multi-phase local permit and inspections
- Written workmanship warranty
Pricing & Timeline in Glendale.
Typical on-site duration: 2 to 6 weeks. Total project schedule from your first call to a passed final inspection depends on the City of Glendale / GWP permit cycle — usually 1-3 weeks.
Glendale-Specific Considerations.
Glendale whole-home rewiring jobs route through City of Glendale / GWP for permits and inspections. We know the local rules, route to the right authority, and attend every inspection on-site. Glendale’s housing stock skews toward 1940s-1970s homes — Glendale has its own utility (GWP) — we’ve worked on those types of properties extensively and know the patterns.
Why Alpha One Electric.
You get the owner on the phone, the owner walking your property, and the owner standing behind every wire we run. We use Siemens panels, Leviton Decora finish devices, Lutron dimmers and smart systems, and rigid steel conduit on exterior runs. We don’t install bargain-tier products. We pull every permit. We attend every inspection. We don’t leave a job until the city has signed off and you’re holding the documentation.